step() call that was removed, renamed, or broken in a refactor shows up this way.
Each email includes a link to the funnel for the affected day and a prompt you can paste into a coding agent connected to Wendung.
When Wendung checks
The check runs every day at 06:00 UTC and looks at the last complete UTC day. It compares that day with the 6 days before it. All dates in alert emails are UTC. Server events can arrive up to 7 days late. The check gives the previous day 6 hours for late events, so a server step whose events usually arrive later than that can show as stopped.What triggers an alert
A step stopped
A step stopped alert fires for two consecutive steps, A and B, when all of these hold for the last complete day:- At least 10 users reached A.
- No user went from A to B.
- At least 9 completions were expected: the users who reached A, times the share of users who went from A to B over the previous 6 days.
- At least 30 users went from A to B over the previous 6 days.
- Over the previous 6 days, the median time from A to B was 1 hour or less.
Events stopped
An events stopped alert fires when no user reached a funnel’s first step on the last complete day, and each of the previous 6 days had at least 9 users. A quiet day in the baseline, such as a weekend with few visitors, prevents the alert. When every funnel with alerts in a project stops on the same day, you get one email for the project. The likely cause is then the SDK no longer loading or the project key changing, not a single funnel.When Wendung doesn’t alert
A funnel is not checked when:- its email alerts are turned off
- its steps changed in the last 7 days, because events sent before the change may not match the new steps
- the workspace reached its event limit and new events are paused
- a data deletion is in progress for the project
- the project received no events in the last 7 days
- it is over the plan’s funnel limit and locked
How often you get an email
You get one email when an alert opens. While the same step, or the same first step, stays stopped, Wendung doesn’t email again. An alert closes after 3 daily checks in a row see users reach the step again. A day with too little traffic to tell either way doesn’t count, and neither does a day when the funnel isn’t checked. Closing sends no email. After an alert closes, the same condition can’t email you again for 7 days.Turn alerts off
- For one funnel: in the project’s Funnels list, open the funnel’s menu, choose Edit, turn off Email alerts, and click Save changes. Wendung then stops sending alert emails for that funnel. Emails about a single funnel link to this page, and the project email links to the project’s funnels list.
- For yourself: open Account from your user menu, choose Notifications, and turn off the workspace under Funnel alert emails. The change saves immediately, and other owners keep getting alerts.